Extension of the Adossat wharf, 2A Phase B (multipurpose terminal)

  • Awarded to UTE AMPLIACIÓ MOLL ADOSSAT

  • Performance time 22 months (in progress)

  • Budget € 23,414,262

Action plan

The Port of Barcelona’s Master Plan provides for the construction or extension of a wharf adjacent to the East Seawall. In addition, the rearrangement of the Port’s container terminals entails the performance of a new section of the Adossat wharf.

This project sets out to extend the second alignment of the Adossat wharf to generate an additional berthing line 290 l.m. long with a draught of 16m. In the short and medium term, the intention is to expand the adjacent container terminal, and in the medium and long term to allow cruise ships to berth there.

Work will be completed by the end of 2018.