Awarded to UTE SYNCROLIFT
Performance time 24 months (in progress)
Budget € 23,871,658
This action seeks to implement a syncrolift between Catalunya wharf and Marina del Port de Barcelona wharf, as well as building a terrace on land reclaimed from the sea for various ship repair and maintenance operations.
The syncrolift is a platform that is hoisted up to pick up vessels and lift them up to terrace level. The platform of this syncrolift will be approximately 80m long and 20m wide. Longitudinally, on both sides of the platform there will be a structure able to withstand the weight of the heavy vessels to be lifted.
It is expected to finish during the first quarter of 2019.